Edgily Navbar (Fixed Header + Icons Mobile)
Edgily thinking outside the Network     Learn more >
EDGILY Portfolio BIM • VDC • IDD

Portfolio of BIM & Digital Delivery Projects

Explore EDGILY’s experience supporting infrastructure, industrial, commercial and mission-critical projects with coordinated 3D models, clash-free delivery, and lifecycle-ready information.

3D BIM Modelling MEP / Structural Coordination Clash Detection 4D 5D QTO Digital Twin
What clients get
Accuracy
QA/QC-led modelling
Coordination
Clash-free workflows
Speed
Faster delivery cycles
Handover
FM / asset readiness

Infrastructure Industrial Commercial Data Centers Pharma Utilities

We Would Like To Hear It From You

MB1A - HARBOURFRONT

JRL VIADUCT

In a crucial role for the Jurong Region Line (JRL) noise barrier installation, we provided specialized Tekla BIM services to create precise, constructible models of the complex steel framing needed to mitigate train noise in densely populated areas. Our detailed 3D modeling and multi-disciplinary clash detection were vital in navigating the intricate geometries of the fully elevated viaducts, ensuring an efficient and error-free fabrication process for the noise barrier components. By leveraging Tekla Structures as a single source of truth and utilizing Trimble Connect for seamless project collaboration, we streamlined workflows for designers, fabricators, and contractors, ultimately enabling a smooth and safe on-site installation while minimizing disruption and ensuring the JRL meets its noise reduction goals.

Read More
SAK-III NEW CHEMICAL PLANT

SAK-III NEW CHEMICAL PLANT

JURONG ISLAND, SINGAPORE

Edgily provided BIM expertise for Kurihara Kogyo Co., Ltd. in delivering Electrical Services for the SAK-III New Chemical Plant, owned by Sumitomo Seika Singapore Pte Ltd. Our scope covered BIM-based 3D modelling of the Electrical systems, construction animation for coordination and stakeholder presentations, and prefabrication planning to improve installation efficiency and quality. The plant forms part of Sumitomo Seika’s expansion in Jurong Island, designed to meet increasing demand for Super Absorbent Polymer (SAP) production. The facility integrates advanced prefabrication methods and digital coordination to support timely delivery and reduce on-site rework.

Read More
AbbVie Bio Facility Expansion

AbbVie Bio Facility Expansion

Project in Singapore

AbbVie’s Singapore manufacturing facility expansion represents a strategic US$223 million investment aimed at significantly increasing biologics production capacity to support growing immunology and oncology demand. As AbbVie’s sole manufacturing site in Asia, the project plays a critical role in the company’s global supply chain, adding 24,000 liters of drug-substance capacity. The expansion demands highly coordinated architectural, structural, and complex MEP/process systems within sterile environments, where BIM enables precise modeling, clash-free coordination, and future-ready asset integration. By supporting rapid manufacturing changeovers in days rather than months, BIM-driven workflows contribute directly to enhanced operational efficiency and long-term facility performance.

Read More
Apple SG campus

Apple SG campus

Apple’s regional operations center expansion in Singapore is a landmark investment of over US$250 million, aimed at upgrading and integrating its existing facilities to support future growth in artificial intelligence and other strategic functions. The project involves a major redevelopment of two adjacent buildings—AMK 2 and AMK 3—at Ang Mo Kio, unifying three distinct spaces into a cohesive, high-performance workplace. Leveraging BIM and VDC methodologies, the project delivers detailed 2D and 3D architectural, structural, and MEP models, advanced clash detection, and accurate quantity take-offs. Integrated Digital Delivery (IDD) services and 4D construction animations further enhance coordination, streamline the transition from design to facilities management, and support smart, efficient operations throughout the asset lifecycle.

Read More
MB1A - HARBOURFRONT

MB1A - HARBOURFRONT

2-STOREY INTERIM FERRY AND CRUISE TERMINAL WITH COVERED LINKBRIDGE TO EXISTING L-PIER, COVERED LINKWAY.

The construction of Mapletree's interim ferry terminal is a significant step towards the potential redevelopment of HarbourFront Centre. The two-story terminal, spanning 17,428.68 square meters, is designed to accommodate ferry and cruise operations for a decade. Key construction aspects include the relocation of existing jetties and pontoons, the construction of new passenger facilities, and the implementation of sustainable design features. Once completed, the interim terminal will provide a modern and efficient facility for passengers, while paving the way for a more ambitious redevelopment of the entire HarbourFront precinct The scope of work for the BIM Consultant encompassed comprehensive architectural, structural, and trade modeling, coordination, collaboration, and documentation, alongside proficient BIM project management.

Read More
WAREHOUSE & FACTORY

WAREHOUSE & FACTORY

5 STOREY BUILDING (SINGAPORE)

Edgily Technologies adeptly orchestrated a seamless BIM integration for the Warehouse and Factory Development, spanning structural, mechanical, electrical, and fire protection disciplines across three levels, incorporating a Basement Level. The initiative encompassed meticulous BIM auditing to ensure meticulous documentation and accuracy in the complex's design and construction. The scope of work for the BIM Consultant encompassed comprehensive trade modeling, coordination, collaboration, and documentation for CSD, alongside proficient BIM project management.

Read More
WATER RECLAMATION PLANT

WATER RECLAMATION PLANT T

PLANT & SUBSTATION (SINGAPORE)

Edgily Technologies successfully executed a comprehensive BIM implementation at the Tuas Water Reclamation Plant, encompassing structural, mechanical, electrical, and fire protection trades. The project involved three levels, including a Basement Level, and included a thorough BIM Audit for optimal documentation and precision in the complex's design and construction. The project for the BIM Consultant for the Structural and MEP all the trade Modelling & Coordination & Collaboration including documentation for the CSD, BIM Project Management.

Read More
DATA CENTER CONSTRUCTION

DATA CENTER CONSTRUCTION

COMMERICAL BUILDING (TAIWAN)

The Project Genesis – Proposed 10 Storeys Data Ceneter construction at Taiwan The project for the BIM Consultant for the Architectural Structural and MEP all the trade Modelling & Coordination & Collobration including 4D Construction Sequence and BIM Project Management.

Read More
SEMICONDUCTOR MANUFACTURE

SEMICONDUCTOR MANUFACTURE

INDUSTRIAL BUILDING (SINGAPORE)

The Semiconductor Manufacture construction at Tampines for the seven building 4-Storey FAB Building, 2- Storey CUB Building, 3-Storey CZ Building, Single Storey Warehouse Building with Mezzanine, Single Storey Hybox Building, 2 Storey Admin -Building, Single Storey Pump House, Single Storey Waste Recycle. The project for the BIM Consultant for the Architectural Structural and MEP all the trade Modelling & Coordination & Collobration including documentation for the CSD, 4D Construction Sequence and Facilty Management & BIM Project Management.

Read More
SIEMENS HEALTHINEERS

SIEMENS HEALTHINEERS

THOMSON EAST COAST (GERMANY)

Edgily has the experience working in Siemens Healthineers which includes total BIM solutions including documentation for Architectural , Structural Mechanical, Electrical, Plumbing and Fire protection trade for the complex will comprise eight levels, with the Basement Level and did the BIM Audit for the Siemens Healthineers. Siemens Healthineers focused on a sustainable life cycle of the buildings. The new building should be able to be operated almost CO2-neural. Since the production processes require a lot of energy and cooling, Siemens Healthineers developed an energy concept that, for example, uses waste heat from the production processes and recovers part of the heat energy.

Read More